Search This Blog

Showing posts with label integration server business. Show all posts
Showing posts with label integration server business. Show all posts

Thursday, February 20, 2020

Edit INTEGRATION_SERVER Business



This document allows us to understand the procedure of editing Integration server business in SAP PI/PO system.

Procedure:
Edit Business system INTEGRATION_SERVER_<SOURCE_SID> in the SLD and adjust to use the <TARGET_PI> technical system

Access the SLD in <TARGET_PI> and select Business systems


Locate the entry  INTEGRATION_SERVER_<SOURCE_SID>


Go to the small print screen and choose the integration tab


For the technical system line, click on Change

Change the system to <TARGET_PI> and select the correct client in <TARGET_PI>


Click on the save button


Fix the pipeline URL and the configuration URL to point to <TARGET_PI>.  don't make any changes to the Group to be updated by the PI Apps team

Click on the associate with XI button then click save


On the installed software tab, make sure that the installed checkbox for SAP Netweaver PI product is ticked and click on save