This procedure is one among the post refresh action of SAP PI/PO system.
It explains on the way to restore the Java system connections (JCO) and destinations post refresh.
Run the NWA and access “Jco RFC Destinations” (Menu path à Configuration Management--> Connectivity--> Jco RFC provider).
For every connection, set the configuration details from details taken before;
It explains on the way to restore the Java system connections (JCO) and destinations post refresh.
Run the NWA and access “Jco RFC Destinations” (Menu path à Configuration Management--> Connectivity--> Jco RFC provider).
For every connection, set the configuration details from details taken before;
Delete all the Jco connections for
the <SOURCE_PI> System (*_<SOURCE_SID>), replacing them with
connections for <TARGET_PI>.
Access “SLD Data Supplier Destinations” (Netweaver admin: Configuration Management-->Connectivity-->Destinations).
Update all connections with the data saved prior to the refresh. Use the ping option to test each connection
Check the connections in the ABAP engine using transaction SMGW (Goto --> Logged on Clients)
All connections should be for <TARGET_SID>
Update all connections with the data saved prior to the refresh. Use the ping option to test each connection
Check the connections in the ABAP engine using transaction SMGW (Goto --> Logged on Clients)
All connections should be for <TARGET_SID>