Search This Blog

Showing posts with label jco connection. Show all posts
Showing posts with label jco connection. Show all posts

Thursday, February 20, 2020

Restore the JAVA system connections and destinations as PI refresh post action



This procedure is one among the post refresh action of SAP PI/PO system.
It explains on the way to restore the Java system connections (JCO) and destinations post refresh.

Run the NWA and access “Jco RFC Destinations” (Menu path à Configuration Management--> Connectivity--> Jco RFC provider).

For every connection, set the configuration details from details taken before;


Delete all the Jco connections for the <SOURCE_PI> System (*_<SOURCE_SID>), replacing them with connections for <TARGET_PI>.


Access “SLD Data Supplier Destinations” (Netweaver admin: Configuration Management--&gt;Connectivity--&gt;Destinations). 

Update all connections with the data saved prior to the refresh.  Use the ping option to test each connection

Check the connections in the ABAP engine using transaction SMGW (Goto --&gt; Logged on Clients)

All connections should be for <TARGET_SID>